Kilve Court is a residential outdoor education centre in Somerset run by Support Services for Education. As part of their service, they required a facility for water-based activities such as canoeing, raft building and swimming.
Ivel Aquatics ltd were appointed as main contractors to carry out the task to construct a brand-new on-site lake to facilitate all the activities required, including kayaking.
The kayaking lake itself was approximately 4500sqm in size and is accessed each end via two adjoining slipways. A pathway was constructed to join both the slipways and the kayak store.
The lake itself is lined with a Firestone EPDM PondGard lake liner complete with and underlay overlay polyfelt matting. As you can see from the images the liner has been surcharged creating a very natural looking lake.
The margins were planted using pre-established coir pallets which consisted of a variety of mixed native species of aquatic plants.
A borehole and pump system were also incorporated with the construction to enable a water top system.
All materials used on this kayak lake construction in Somerset can be supplied and installed by Ivel Aquatics ltd.
The tasks included in the construction of this kayak lake in Somerset were:
- Legislative Permits
- Topography surveys
- Test excavations and soil samples
- Construction of lake (Earthworks)
- Lining of lake (Firestone EPDM)
- Surcharging of lake (Earthworks)
- Planting of lake (Coir products)
- Hard landscaping (Pathways/slipways)
- Water Inlet/outlets
- Borehole Installation
- Electrical engineers
- Kayak store construction
- Tree planting
Contact us today for free, no obligation quotation.