Nicospan Installation

Ivel were appointed contractors to install 450m of nicospan on the Bridgwater & Taunton Canal. The nicospan was installed at 1.5m depth with 2.4m softwood posts every 500mm centres.

Contact us today for a free, no obligation quotation.