This project involved the complete removal and replacement of an ageing softwood revetment and jetty system with a brand new green oak installation. The works were carried out to significantly improve both the structural integrity and visual appearance of the lakeside environment.
The original softwood revetment had deteriorated over time and required full replacement. Our team carefully removed the existing structure before installing a robust green oak revetment system designed to provide long-term durability while complementing the natural surroundings of the site.
Alongside the revetment works, the existing softwood jetty was also removed and replaced with a new heavy-duty green oak jetty platform, providing a clean, modern finish and a substantial upgrade to the waterside access area.
The project involved detailed groundwork, excavation, precision timber installation, and final landscaping works to ensure the completed installation blended naturally into the surrounding landscape while delivering a durable and high-quality finish.